
Under 36 dB
USB-C Rechargeable
Free US Shipping
Hands-Free Cooling
Under 36 dB
USB-C Rechargeable
Free US Shipping
Hands-Free Cooling
Under 36 dB
USB-C Rechargeable
Free US Shipping
Hands-Free Cooling
Under 36 dB
USB-C Rechargeable
Free US Shipping
Hands-Free Cooling
How it works
Sealed blades, open airflow
The blades sit sealed inside the round body — air pulls in through the side vents and comes out the front grille. Nothing spins in the open, so nothing catches hair. The flexible silicone J-clip locks onto straps, collars, and waistbands.
- A few speed settings
- USB-C rechargeable (1000-1200 mAh)
- Under 36 dB · ~225 g (about your phone) · ABS body · 3 colors
In their words
Real customers, real relief
Tap a video for sound.
Worn all day
Wherever your day gets hot
Good to know
Quiet enough to sleep next to
It runs under 36 dB, quieter than a fridge — you’ll hear your podcast, not the fan.
Tracked shipping to your door
30-day returns
Summer’s not done yet. Clip one on before it is.
Shop Now — Before Summer’s OverQuestions? We're here to help
Reach our US-based team and we'll get back to you by email — before or after your order.
